Assessment Year | 2006 |
---|---|
Principal Product | plumbing fixtures |
NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
155,000
ft2
|
Annual Production | 350,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $423,742 | 9,778,000 |
kWh
|
$0.043 |
Electricity Demand | $108,137 | 25,444 |
kW-mo/yr
|
$4.25 |
Electricity Fees | $202 | - |
|
- |
Natural Gas | $147,027 | 14,678 |
MMBtu
|
$10.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $166,851 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,616 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $13,979 | $24,586 |
$(-249.0)
(-5,968)
kWh
|
$(-51.0)
-
kW-mo/yr
|
$14,279
-
MMBtu
|
- | - | - | |
02 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $8,595 | $1,300 | - | - | - |
$5,685
-
Tgal
|
$2,910 | - | |
03 | 2.1133: Adjust burners for efficient operation | $2,620 | $1,500 | - | - |
$2,620
-
MMBtu
|
- | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $9,620 | $20,000 | - | - |
$9,620
-
MMBtu
|
- | - | - | |
05 | 2.2121: Increase amount of condensate returned | $12,198 | $7,290 | - | - |
$8,076
-
MMBtu
|
- | $2,273 |
$1,849
-
Tgal
|
|
06 | 2.2136: Install / repair insulation on steam lines | $2,156 | $455 | - | - |
$2,156
-
MMBtu
|
- | - | - | |
07 | 2.7229: Air condition only space necessary | $11,658 | $6,500 |
$10,808
241,208
kWh
|
$850
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7241: Install outside air damper / economizer on hvac unit | $18,883 | $20,000 |
$18,883
451,866
kWh
|
- | - | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,535 | $100 |
$2,938
70,304
kWh
|
$597
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,046 | $1,735 |
$870
20,818
kWh
|
$176
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,361 | $50 |
$2,337
55,920
kWh
|
$475
-
kW-mo/yr
|
- | - | $549 | - | |
12 | 4.311: Schedule deliveries according to demand | $79,200 | $25,000 | - | - | - | - | $79,200 | - | |
TOTAL RECOMMENDED | $166,851 | $108,516 |
$35,587
834,148
kWh
|
$2,047
-
kW-mo/yr
|
$36,751
-
MMBtu
|
$5,685
-
Tgal
|
$84,932 |
$1,849
-
Tgal
|
||
TOTAL IMPLEMENTED | $34,616 | $27,390 |
$21,821
522,170
kWh
|
$597
-
kW-mo/yr
|
$8,076
-
MMBtu
|
- | $2,273 |
$1,849
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs