ITAC Assessment: AR0169
ITAC logo
ITAC Assessment: AR0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Unsupported plastics film and sheets
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 30,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 2,912
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,868 10,322,978
kWh
Electricity Demand $192,151 18,844
kW-mo/yr
Natural Gas $107,919 32,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,698 $6,378 $1,601
48,652
kWh
$1,097
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,846 $2,882 $1,223
37,222
kWh
$623
-
kW-mo/yr
- -
03 3.4155: Meter waste water $672 $500 - - $672
-
Tgal
-
04 4.513: Re-arrange equipment layout to reduce labor costs $42,399 $1,284 - - - $42,399
TOTAL RECOMMENDED $47,615 $11,044 $2,824
85,874
kWh
$1,720
-
kW-mo/yr
$672
-
Tgal
$42,399
TOTAL IMPLEMENTED $2,698 $6,378 $1,601
48,652
kWh
$1,097
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs