ITAC Assessment: NC0332
ITAC logo
ITAC Assessment: NC0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Pharmaceutical preparations
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 51,200
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,358 4,555,800
kWh
Electricity Demand $202,835 17,766
kW-mo/yr
Electricity Fees $11,602 -
Natural Gas $267,513 20,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $20,455 $12,000 $387
14,400
kWh
$22,878
-
kW-mo/yr
- $(-2,810.0)
-
MMBtu
02 2.3113: Make ice during off peak hours for cooling $39,950 $210,000 - $39,950
-
kW-mo/yr
- -
03 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $17,210 $28,200 $(-1,277.0)
(-47,533)
kWh
$(-69.0)
-
kW-mo/yr
$18,556
-
MMBtu
-
04 2.2123: Insulate feedwater tank $389 $277 - - $389
-
MMBtu
-
05 2.2511: Insulate bare equipment $406 $86 $208
7,750
kWh
$198
-
kW-mo/yr
- -
TOTAL RECOMMENDED $78,410 $250,563 $(-682.0)
(-25,383)
kWh
$62,957
-
kW-mo/yr
$18,945
-
MMBtu
$(-2,810.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs