Assessment Year | 2006 |
---|---|
Principal Product | Pharmaceutical preparations |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
51,200
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,358 | 4,555,800 |
kWh
|
$0.028 |
Electricity Demand | $202,835 | 17,766 |
kW-mo/yr
|
$11.42 |
Electricity Fees | $11,602 | - |
|
- |
Natural Gas | $267,513 | 20,557 |
MMBtu
|
$13.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $20,455 | $12,000 |
$387
14,400
kWh
|
$22,878
-
kW-mo/yr
|
- |
$(-2,810.0)
-
MMBtu
|
|
02 | 2.3113: Make ice during off peak hours for cooling | $39,950 | $210,000 | - |
$39,950
-
kW-mo/yr
|
- | - | |
03 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $17,210 | $28,200 |
$(-1,277.0)
(-47,533)
kWh
|
$(-69.0)
-
kW-mo/yr
|
$18,556
-
MMBtu
|
- | |
04 | 2.2123: Insulate feedwater tank | $389 | $277 | - | - |
$389
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $406 | $86 |
$208
7,750
kWh
|
$198
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $78,410 | $250,563 |
$(-682.0)
(-25,383)
kWh
|
$62,957
-
kW-mo/yr
|
$18,945
-
MMBtu
|
$(-2,810.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs