ITAC Assessment: NC0325
ITAC logo
ITAC Assessment: NC0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Dyed yarn
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,166 21,306,698
kWh
Electricity Demand $283,024 33,935
kW-mo/yr
Coal $2,000,000 783,167
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $266,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Coal Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2121: Increase amount of condensate returned $27,917 $25,000 - - $16,467
-
MMBtu
$11,450
-
Tgal
- -
02 2.1133: Adjust burners for efficient operation $222,508 $100,000 - - $222,508
-
MMBtu
- - -
03 2.2136: Install / repair insulation on steam lines $9,902 $18,198 - - $9,902
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $423 $1,006 $246
14,612
kWh
$177
-
kW-mo/yr
- - - -
05 2.7111: Reduce illumination to minimum necessary levels $2,395 $2,000 $1,425
84,753
kWh
$970
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,733 $7,500 $810
48,180
kWh
$550
-
kW-mo/yr
- - $2,099 $274
TOTAL RECOMMENDED $266,878 $153,704 $2,481
147,545
kWh
$1,697
-
kW-mo/yr
$248,877
-
MMBtu
$11,450
-
Tgal
$2,099 $274
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Coal Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs