Assessment Year | 2006 |
---|---|
Principal Product | lighting |
NAICS | 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing |
SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 614 |
Plant Area |
470,000
ft2
|
Annual Production | 365,000
pieces
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $444,426 | 10,439,161 |
kWh
|
$0.043 |
Electricity Demand | $83,578 | 21,991 |
kW-mo/yr
|
$3.80 |
Electricity Fees | $342,422 | - |
|
- |
Natural Gas | $430,915 | 41,494 |
MMBtu
|
$10.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $292,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $218,683 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $183,533 | $1,062 |
$177,994
534,067
kWh
|
- | $5,539 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,150 | $123,600 |
$33,324
99,840
kWh
|
$875
-
kW-mo/yr
|
$951 | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $29,145 | $4,200 |
$28,266
84,812
kWh
|
- | $879 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $27,793 | $12,375 |
$26,347
79,054
kWh
|
$693
-
kW-mo/yr
|
$753 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,432 | $64,150 |
$15,102
45,314
kWh
|
$952
-
kW-mo/yr
|
$378 | |
TOTAL RECOMMENDED | $292,053 | $205,387 |
$281,033
843,087
kWh
|
$2,520
-
kW-mo/yr
|
$8,500 | ||
TOTAL IMPLEMENTED | $218,683 | $124,662 |
$211,318
633,907
kWh
|
$875
-
kW-mo/yr
|
$6,490 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs