ITAC Assessment: MS0300
ITAC logo
ITAC Assessment: MS0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product lighting
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 614
Plant Area 470,000
ft2
Annual Production 365,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,426 10,439,161
kWh
Electricity Demand $83,578 21,991
kW-mo/yr
Electricity Fees $342,422 -
Natural Gas $430,915 41,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $292,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $218,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $183,533 $1,062 $177,994
534,067
kWh
- $5,539
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,150 $123,600 $33,324
99,840
kWh
$875
-
kW-mo/yr
$951
03 2.7221: Lower temperature during the winter season and vice-versa $29,145 $4,200 $28,266
84,812
kWh
- $879
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $27,793 $12,375 $26,347
79,054
kWh
$693
-
kW-mo/yr
$753
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,432 $64,150 $15,102
45,314
kWh
$952
-
kW-mo/yr
$378
TOTAL RECOMMENDED $292,053 $205,387 $281,033
843,087
kWh
$2,520
-
kW-mo/yr
$8,500
TOTAL IMPLEMENTED $218,683 $124,662 $211,318
633,907
kWh
$875
-
kW-mo/yr
$6,490