ITAC Assessment: NC0324
ITAC logo
ITAC Assessment: NC0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Upholstered furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 410
Plant Area 365,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,210 2,147,749
kWh
Electricity Demand $73,471 10,032
kW-mo/yr
Electricity Fees $6,505 -
Natural Gas $82,710 6,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.5316: Contract a wood pallet recycling company $4,040 $500 - - - $4,040
-
lb
02 3.5313: Increase amount of waste recovered for resale $524 $500 - - - $524
-
lb
03 2.7241: Install outside air damper / economizer on hvac unit $413 $2,000 $413
10,101
kWh
- - -
04 2.3113: Make ice during off peak hours for cooling $1,571 $5,425 $628
15,363
kWh
$943
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $2,365 $3,749 $(-69.0)
(-1,682)
kWh
$(-28.0)
-
kW-mo/yr
$2,462
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,020 $1,991 $750
18,350
kWh
$270
-
kW-mo/yr
- -
TOTAL RECOMMENDED $9,933 $14,165 $1,722
42,132
kWh
$1,185
-
kW-mo/yr
$2,462
-
MMBtu
$4,564
-
lb
TOTAL IMPLEMENTED $5,060 $2,491 $750
18,350
kWh
$270
-
kW-mo/yr
- $4,040
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs