Assessment Year | 2004 |
---|---|
Principal Product | Blankets |
NAICS | 313210: Broadwoven Fabric Mills |
SIC | 2392: House furnishing, Except Curtains and Draperies |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
400,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $484,336 | 17,887,754 |
kWh
|
$0.027 |
Electricity Demand | $338,965 | 322,282 |
kW-mo/yr
|
$1.05 |
Electricity Fees | $8,561 | - |
|
- |
Natural Gas | $1,136,297 | 200,815 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,903 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,055 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $25,824 | $24,000 | n/a |
$(-612.0)
(-22,680)
kWh
|
$(-340.0)
-
kW-mo/yr
|
$26,776
-
MMBtu
|
- | - | - |
02 | 2.2127: Flash condensate to produce lower pressure steam | $27,494 | $13,050 | - | - |
$25,331
-
MMBtu
|
$1,082
-
Tgal
|
- | $1,081 | |
03 | 2.1133: Adjust burners for efficient operation | $20,008 | $3,000 | - | - |
$20,008
-
MMBtu
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,821 | $400 |
$3,742
138,600
kWh
|
$2,079
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,732 | $100 |
$1,692
62,664
kWh
|
$940
-
kW-mo/yr
|
- | - | $(-600.0) | $(-300.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,024 | $4,207 |
$1,944
72,000
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $83,903 | $44,757 |
$6,766
250,584
kWh
|
$3,759
-
kW-mo/yr
|
$72,115
-
MMBtu
|
$1,082
-
Tgal
|
$(-600.0) | $781 | ||
TOTAL IMPLEMENTED | $55,055 | $16,550 |
$5,434
201,264
kWh
|
$3,019
-
kW-mo/yr
|
$45,339
-
MMBtu
|
$1,082
-
Tgal
|
$(-600.0) | $781 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs