Assessment Year | 2004 |
---|---|
Principal Product | Folding cartons |
NAICS | 322212: Folding Paperboard Box Manufacturing |
SIC | 2631: Paperboard Mills |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
203,000
ft2
|
Annual Production | 1,000,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $418,824 | 9,894,692 |
kWh
|
$0.042 |
Electricity Demand | $121,957 | 25,629 |
kW-mo/yr
|
$4.76 |
Electricity Fees | $3,028 | - |
|
- |
Natural Gas | $72,695 | 7,538 |
MMBtu
|
$9.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,722 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.322: Eliminate old stock and modify inventory control | $39,250 | $10,000 | - | - | - | $39,250 | - | |
02 | 2.7245: Use direct air supply to exhaust hoods | $32,270 | $2,500 |
$1,358
32,100
kWh
|
$1,414
-
kW-mo/yr
|
$29,498
-
MMBtu
|
- | - | |
03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $9,891 | $17,930 | - | - |
$9,891
-
MMBtu
|
- | - | |
04 | 2.7313: Recycle air for heating, ventilation and air conditioning | $17,538 | $27,880 |
$1,314
31,060
kWh
|
- |
$16,224
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,961 | $3,154 |
$1,601
37,851
kWh
|
$360
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $812 | $100 |
$1,642
38,820
kWh
|
$370
-
kW-mo/yr
|
- | $(-800.0) | $(-400.0) | |
TOTAL RECOMMENDED | $101,722 | $61,564 |
$5,915
139,831
kWh
|
$2,144
-
kW-mo/yr
|
$55,613
-
MMBtu
|
$38,450 | $(-400.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs