Assessment Year | 2004 |
---|---|
Principal Product | Mailing envelopes |
NAICS | 322230: Stationery Product Manufacturing |
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
133,436
ft2
|
Annual Production | 1,100,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,568 | 5,586,000 |
kWh
|
$0.016 |
Electricity Demand | $89,840 | 10,772 |
kW-mo/yr
|
$8.34 |
Electricity Fees | $14,400 | - |
|
- |
Natural Gas | $39,789 | 3,921 |
MMBtu
|
$10.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | By-product Production Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.421: Modify current incentive program | $53,200 | $10,376 | n/a | - | - | - | - | - | $(-36,800.0) | $(-90,000.0) | - | - | $180,000 |
02 | 3.4114: Replace city water with recycled water via cooling tower | $17,751 | $16,000 | n/a | - | - | - |
$17,751
-
Tgal
|
- | - | - | - | - | - |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,368 | $6,692 | n/a |
$2,595
166,243
kWh
|
$2,773
-
kW-mo/yr
|
- | - | - | - | - | - | - | - |
04 | 2.2437: Recover waste heat from equipment | $8,211 | $2,738 | n/a | - | - |
$8,211
-
MMBtu
|
- | - | - | - | - | - | - |
05 | 2.7313: Recycle air for heating, ventilation and air conditioning | $4,313 | $6,553 | n/a |
$314
20,129
kWh
|
- |
$3,999
-
MMBtu
|
- | - | - | - | - | - | - |
06 | 2.2437: Recover waste heat from equipment | $1,084 | $720 | n/a |
$524
33,600
kWh
|
$560
-
kW-mo/yr
|
- | - | - | - | - | - | - | - |
07 | 2.7131: Add area lighting switches | $297 | $750 | n/a |
$297
19,002
kWh
|
- | - | - | - | - | - | - | - | - |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $115 | $100 | n/a |
$549
35,152
kWh
|
$586
-
kW-mo/yr
|
- | - | - | $(-720.0) | - | $(-300.0) | - | - |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $45 | $50 | n/a | - | - | - | - |
$142
-
lb
|
$(-144.0) | - | - | $47 | - |
TOTAL RECOMMENDED | $90,384 | $43,979 |
$4,279
274,126
kWh
|
$3,919
-
kW-mo/yr
|
$12,210
-
MMBtu
|
$17,751
-
Tgal
|
$142
-
lb
|
$(-37,664.0) | $(-90,000.0) | $(-300.0) | $47 | $180,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | By-product Production Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs