Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Mailing envelopes
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 133,436
ft2
Annual Production 1,100,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,568 5,586,000
kWh
Electricity Demand $89,840 10,772
kW-mo/yr
Electricity Fees $14,400 -
Natural Gas $39,789 3,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
01 4.421: Modify current incentive program $53,200 $10,376 n/a - - - - - $(-36,800.0) $(-90,000.0) - - $180,000
02 3.4114: Replace city water with recycled water via cooling tower $17,751 $16,000 n/a - - - $17,751
-
Tgal
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,368 $6,692 n/a $2,595
166,243
kWh
$2,773
-
kW-mo/yr
- - - - - - - -
04 2.2437: Recover waste heat from equipment $8,211 $2,738 n/a - - $8,211
-
MMBtu
- - - - - - -
05 2.7313: Recycle air for heating, ventilation and air conditioning $4,313 $6,553 n/a $314
20,129
kWh
- $3,999
-
MMBtu
- - - - - - -
06 2.2437: Recover waste heat from equipment $1,084 $720 n/a $524
33,600
kWh
$560
-
kW-mo/yr
- - - - - - - -
07 2.7131: Add area lighting switches $297 $750 n/a $297
19,002
kWh
- - - - - - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $115 $100 n/a $549
35,152
kWh
$586
-
kW-mo/yr
- - - $(-720.0) - $(-300.0) - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $45 $50 n/a - - - - $142
-
lb
$(-144.0) - - $47 -
TOTAL RECOMMENDED $90,384 $43,979 $4,279
274,126
kWh
$3,919
-
kW-mo/yr
$12,210
-
MMBtu
$17,751
-
Tgal
$142
-
lb
$(-37,664.0) $(-90,000.0) $(-300.0) $47 $180,000
TOTAL IMPLEMENTED - - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs