ITAC Assessment: NC0290
ITAC logo
ITAC Assessment: NC0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Body Panels for Heavy Duty Trucks
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 250,000
ft2
Annual Production 927,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $506,488 19,147,200
kWh
Electricity Demand $296,830 35,698
kW-mo/yr
Natural Gas $570,470 77,231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.113: Install refrigeration system to cool product $145,703 $276,000 $5,171
195,862
kWh
$(-8,468.0)
-
kW-mo/yr
- $165,600 $(-16,600.0)
02 2.7313: Recycle air for heating, ventilation and air conditioning $9,371 $4,079 - - $9,371
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $8,085 $5,500 - - $8,085
-
MMBtu
- -
04 2.2511: Insulate bare equipment $2,865 $9,174 - - $3,665
-
MMBtu
$(-800.0) -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,206 $2,269 $740
28,029
kWh
$466
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $612 $100 $1,112
42,120
kWh
$700
-
kW-mo/yr
- $(-800.0) $(-400.0)
07 2.2136: Install / repair insulation on steam lines $10,346 $2,533 - - $10,346
-
MMBtu
- -
TOTAL RECOMMENDED $178,188 $299,655 $7,023
266,011
kWh
$(-7,302.0)
-
kW-mo/yr
$31,467
-
MMBtu
$164,000 $(-17,000.0)
TOTAL IMPLEMENTED $156,661 $278,633 $6,283
237,982
kWh
$(-7,768.0)
-
kW-mo/yr
$10,346
-
MMBtu
$164,800 $(-17,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs