Assessment Year | 2004 |
---|---|
Principal Product | Rivets and fasteners |
NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
88,000
ft2
|
Annual Production | 630,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,630 | 4,225,000 |
kWh
|
$0.029 |
Electricity Demand | $93,793 | 9,812 |
kW-mo/yr
|
$9.56 |
Electricity Fees | $665 | - |
|
- |
Natural Gas | $56,590 | 5,619 |
MMBtu
|
$10.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,589 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,564 | $435 |
$948
32,700
kWh
|
$616
-
kW-mo/yr
|
- | - | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $1,570 | $1,725 |
$952
32,833
kWh
|
$618
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $239 | $100 |
$509
17,539
kWh
|
$330
-
kW-mo/yr
|
- | $(-400.0) | $(-200.0) | |
04 | 2.2437: Recover waste heat from equipment | $15,216 | $3,800 | - | - |
$15,216
-
MMBtu
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,010 | $1,580 |
$1,218
42,000
kWh
|
$792
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $222 | $178 |
$222
7,641
kWh
|
- | - | - | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $6,244 | $18,900 |
$6,244
183,678
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $27,065 | $26,718 |
$10,093
316,391
kWh
|
$2,356
-
kW-mo/yr
|
$15,216
-
MMBtu
|
$(-400.0) | $(-200.0) | ||
TOTAL IMPLEMENTED | $18,589 | $6,060 |
$2,409
83,072
kWh
|
$1,564
-
kW-mo/yr
|
$15,216
-
MMBtu
|
$(-400.0) | $(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs