Assessment Year | 2004 |
---|---|
Principal Product | urethane and rubber coated fabrics |
NAICS | 313320: Fabric Coating Mills |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
276,000
ft2
|
Annual Production | 15,300
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $292,169 | 11,150,128 |
kWh
|
$0.026 |
Electricity Demand | $180,460 | 18,477 |
kW-mo/yr
|
$9.77 |
Natural Gas | $657,185 | 90,201 |
MMBtu
|
$7.29 |
Fuel Oil #2 | $28,944 | 4,093 |
MMBtu
|
$7.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,531 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $99,451 | $151,800 | n/a |
$(-2,003.0)
(-76,459)
kWh
|
$(-1,849.0)
-
kW-mo/yr
|
$103,303
-
MMBtu
|
- |
02 | 2.5194: Redesign process | $5,960 | $6,000 | n/a |
$5,960
227,479
kWh
|
- | - | - |
03 | 2.1133: Adjust burners for efficient operation | $7,098 | $1,000 | n/a | - | - |
$7,098
-
MMBtu
|
- |
04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,574 | $1,000 | n/a | - | - |
$3,574
-
MMBtu
|
- |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,233 | $240 | n/a |
$868
19,200
kWh
|
$365
-
kW-mo/yr
|
- | - |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,215 | $936 | n/a |
$811
15,540
kWh
|
$296
-
kW-mo/yr
|
- | $108 |
TOTAL RECOMMENDED | $118,531 | $160,976 |
$5,636
185,760
kWh
|
$(-1,188.0)
-
kW-mo/yr
|
$113,975
-
MMBtu
|
$108 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs