ITAC Assessment: NC0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Furniture components
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 130,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,624 4,074,000
kWh
Electricity Demand $122,711 14,487
kW-mo/yr
Electricity Fees $14,723 -
Fuel Oil #2 $14,723 531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.1114: Limit and control secondary combustion air in furnace $3,220 $20,000 - - $3,220
-
MMBtu
- - - -
02 3.4156: Use flow control valves on equipment to optimize water use $25,415 $25,000 - - - $415
-
Tgal
$25,000 - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,096 $1,875 $805
51,600
kWh
$1,291
-
kW-mo/yr
- - - - -
04 4.125: $59,248 $6,000 - - $(-5,951.0)
-
MMBtu
- - - $65,199
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,880 $9,200 $888
56,933
kWh
$1,425
-
kW-mo/yr
- $567
-
Tgal
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $120 $30
1,944
kWh
$49
-
kW-mo/yr
- - - $40 -
07 2.7135: Install occupancy sensors $253 $775 $253
16,188
kWh
- - - - - -
08 2.4239: Eliminate or reduce compressed air usage $68 $80 $26
1,680
kWh
$42
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $93,299 $63,050 $2,002
128,345
kWh
$2,807
-
kW-mo/yr
$(-2,731.0)
-
MMBtu
$982
-
Tgal
$25,000 $40 $65,199
TOTAL IMPLEMENTED $64,564 $27,875 $805
51,600
kWh
$1,291
-
kW-mo/yr
$(-2,731.0)
-
MMBtu
- - - $65,199
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs