ITAC Assessment: NC0275
ITAC logo
ITAC Assessment: NC0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Paperboard beverage cartons
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 300,000
ft2
Annual Production 66,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,067 7,983,477
kWh
Electricity Demand $179,447 16,457
kW-mo/yr
Electricity Fees $13,746 -
Natural Gas $227,253 35,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $2,058 $5,954 - - $2,058
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,721 $63,800 $19,503
704,068
kWh
$27,622
-
kW-mo/yr
$(-19,404.0)
-
MMBtu
$(-2,000.0)
03 2.2491: Use cooling air which cools hot work pieces for space heating $12,088 $7,190 - - $12,088
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $4,207 $4,563 $4,207
151,870
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $455 $683 $211
7,620
kWh
$244
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,010 $4,120 $1,395
50,359
kWh
$1,615
-
kW-mo/yr
- -
TOTAL RECOMMENDED $47,539 $86,310 $25,316
913,917
kWh
$29,481
-
kW-mo/yr
$(-5,258.0)
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED $4,662 $5,246 $4,418
159,490
kWh
$244
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs