Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Corrugated containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2650:
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 188,000
ft2
Annual Production 480,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,608 4,886,897
kWh
Electricity Demand $143,960 12,100
kW-mo/yr
Natural Gas $257,905 47,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $466,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings By-product Production Savings Increase in Production Savings
01 2.1331: Burn a less expensive grade of fuel $174,891 $550,000 - - $222,891
-
MMBtu
- $(-10,000.0) - $(-38,000.0) -
02 2.7313: Recycle air for heating, ventilation and air conditioning $21,031 $45,000 - - $21,031
-
MMBtu
- - - - -
03 2.6218: Turn off equipment when not in use $4,507 $500 $3,450
145,960
kWh
$1,057
-
kW-mo/yr
- - - - - -
04 2.2437: Recover waste heat from equipment $5,417 $12,587 $(-83.0)
(-3,495)
kWh
$(-76.0)
-
kW-mo/yr
$5,576
-
MMBtu
- - - - -
05 2.2414: Use waste heat from hot flue gases to preheat $6,851 $30,000 - - $6,851
-
MMBtu
- - - - -
06 2.2511: Insulate bare equipment $2,112 $4,375 - - $2,112
-
MMBtu
- - - - -
07 2.4239: Eliminate or reduce compressed air usage $123 $200 $51
2,174
kWh
$72
-
kW-mo/yr
- - - - - -
08 2.1221: Replace obsolete burners with more efficient ones $1,260 $28,000 - - $1,260
-
MMBtu
- - - - -
09 4.611: Begin a practice of predictive / preventative maintenance $60,400 $20,000 - - - $(-8,000.0) - $68,400 - -
10 4.421: Modify current incentive program $190,000 $14,000 - - - - - - - $190,000
TOTAL RECOMMENDED $466,592 $704,662 $3,418
144,639
kWh
$1,053
-
kW-mo/yr
$259,721
-
MMBtu
$(-8,000.0) $(-10,000.0) $68,400 $(-38,000.0) $190,000
TOTAL IMPLEMENTED $68,402 $53,075 $3,501
148,134
kWh
$1,129
-
kW-mo/yr
$3,372
-
MMBtu
$(-8,000.0) - $68,400 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs