ITAC Assessment: NC0249
ITAC logo
ITAC Assessment: NC0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Upholstery fabric
NAICS
n/a
SIC 2210:
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 13,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,177 12,149,500
kWh
Electricity Demand $222,638 23,635
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.6125: Keep equipment clean $20,000 $10,600 n/a - - $20,000 -
02 2.4239: Eliminate or reduce compressed air usage $1,557 - n/a $83
3,130
kWh
$1,474
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $12,181 $500 n/a $8,089
304,080
kWh
$4,092
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $621 $290 n/a $91
3,407
kWh
$530
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $68 - n/a $68
2,555
kWh
- - -
06 2.7124: Make a practice of turning off lights when not needed $2,159 $2,600 n/a $1,454
54,662
kWh
$705
-
kW-mo/yr
- -
07 2.3132: Recharge batteries on during off-peak demand periods $658 - n/a - $658
-
kW-mo/yr
- -
08 4.431: Train operators for maximum operating efficiency $10,000 $10,000 n/a - - - $10,000
TOTAL RECOMMENDED $47,244 $23,990 $9,785
367,834
kWh
$7,459
-
kW-mo/yr
$20,000 $10,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs