ITAC Assessment: NC0217
ITAC logo
ITAC Assessment: NC0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Socks
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 155,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $428,792 7,417,930
kWh
Electricity Demand $149,063 18,017
kW-mo/yr
Electricity Fees $11,555 -
Natural Gas $230,662 38,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,205 $3,300 $3,484
52,000
kWh
$1,045
-
kW-mo/yr
$(-1,324.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,659 $6,560 $6,125
91,411
kWh
$534
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $6,328 $5,000 $(-469.0)
(-7,000)
kWh
$(-98.0)
-
kW-mo/yr
$6,895
-
MMBtu
-
04 2.2511: Insulate bare equipment $2,283 $1,180 - - $2,283
-
MMBtu
-
05 2.7313: Recycle air for heating, ventilation and air conditioning $22,804 $35,000 $2,082
31,080
kWh
- $20,722
-
MMBtu
-
06 2.1133: Adjust burners for efficient operation $11,002 $2,200 - - $11,002
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $3,344 $2,483 $3,075
45,890
kWh
$269
-
kW-mo/yr
- -
08 2.2444: Use hot process fluids to preheat incoming process fluids $25,814 $29,000 - - $25,814
-
MMBtu
-
09 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $27,457 $100,000 $14,800
400,000
kWh
$24,900
-
kW-mo/yr
$(-8,243.0)
-
MMBtu
$(-4,000.0)
TOTAL RECOMMENDED $108,896 $184,723 $29,097
613,381
kWh
$26,650
-
kW-mo/yr
$57,149
-
MMBtu
$(-4,000.0)
TOTAL IMPLEMENTED $21,005 $11,243 $9,200
137,301
kWh
$803
-
kW-mo/yr
$11,002
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs