Assessment Year | 2001 |
---|---|
Principal Product | Chromium based chemicals |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 224 |
Plant Area |
50,000
ft2
|
Annual Production | 200,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,217,605 | 93,823,888 |
kWh
|
$0.024 |
Electricity Demand | $1,636,806 | 102,219 |
kW-mo/yr
|
$16.01 |
Electricity Fees | $1,523 | - |
|
- |
Fuel Oil #6 | $10,000,000 | 2,884,615 |
MMBtu
|
$3.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $363,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $234,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7134: Use photocell controls | $2,595 | $2,000 |
$946
40,077
kWh
|
$1,649
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $82,133 | $143,940 | n/a |
$(-3,330.0)
(-141,120)
kWh
|
$(-3,030.0)
-
kW-mo/yr
|
$88,493
-
MMBtu
|
- |
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $158,850 | $100,000 | - | - |
$158,850
-
MMBtu
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $44,160 | $90,000 | - | - |
$44,160
-
MMBtu
|
- | |
05 | 4.625: Develop standard operating procedures | $3,000 | $5,000 | - | - | - | $3,000 | |
06 | 4.625: Develop standard operating procedures | $8,000 | $500 | - | - | - | $8,000 | |
07 | 2.1113: Reduce combustion air flow to optimum | $65,115 | $86,000 | - | - |
$65,115
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $363,853 | $427,440 |
$(-2,384.0)
(-101,043)
kWh
|
$(-1,381.0)
-
kW-mo/yr
|
$356,618
-
MMBtu
|
$11,000 | ||
TOTAL IMPLEMENTED | $234,560 | $188,500 |
$946
40,077
kWh
|
$1,649
-
kW-mo/yr
|
$223,965
-
MMBtu
|
$8,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs