ITAC Assessment: NC0190
ITAC logo
ITAC Assessment: NC0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Denim fabric
NAICS
n/a
SIC 2210:
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 500,000
ft2
Annual Production 1,300
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,577,233 85,932,885
kWh
Electricity Demand $1,200,092 36,764
kW-mo/yr
Electricity Fees $156,885 -
Fuel Oil #6 $1,183,977 427,091
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $334,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.1133: Adjust burners for efficient operation $16,521 $3,000 n/a - - $16,521
-
MMBtu
- -
02 2.1232: Keep boiler tubes clean $16,531 $15,000 n/a - - $16,531
-
MMBtu
- -
03 3.5313: Increase amount of waste recovered for resale $163 $300 n/a - - - - $163
-
lb
04 3.4153: Use counter current rinsing to reduce waste water $19,521 $8,000 n/a - - $12,321
-
MMBtu
$7,200
-
Tgal
-
05 2.7122: Disconnect ballasts $2,180 $1,800 n/a $1,422
47,479
kWh
$758
-
kW-mo/yr
- - -
06 2.2425: Use flue gases to heat process or service water $202,493 $450,000 n/a $(-4,186.0)
(-139,508)
kWh
$(-2,120.0)
-
kW-mo/yr
$210,479
-
MMBtu
$(-1,680.0)
-
Tgal
-
07 2.2444: Use hot process fluids to preheat incoming process fluids $76,945 $200,000 n/a - - $76,945
-
MMBtu
- -
TOTAL RECOMMENDED $334,354 $678,100 $(-2,764.0)
(-92,029)
kWh
$(-1,362.0)
-
kW-mo/yr
$332,797
-
MMBtu
$5,520
-
Tgal
$163
-
lb
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs