ITAC Assessment: NC0177
ITAC logo
ITAC Assessment: NC0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Tricot knit fabrics
NAICS
n/a
SIC 2259: Knitting Mills, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 100,000
ft2
Annual Production 225,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,944 8,822,099
kWh
Electricity Demand $183,840 19,528
kW-mo/yr
Electricity Fees $6,860 -
Natural Gas $346,976 90,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $434 $120 $278
9,965
kWh
$156
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $2,366 $2,141 $1,516
54,220
kWh
$850
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $8,265 $420 $5,292
189,039
kWh
$2,973
-
kW-mo/yr
- - -
04 3.5313: Increase amount of waste recovered for resale $450 $500 - - - $450
-
lb
-
05 3.4115: Recover and reuse cooling water $97,444 $35,500 - - $37,020
-
MMBtu
- $60,424
-
Tgal
TOTAL RECOMMENDED $108,959 $38,681 $7,086
253,224
kWh
$3,979
-
kW-mo/yr
$37,020
-
MMBtu
$450
-
lb
$60,424
-
Tgal
TOTAL IMPLEMENTED $100,694 $38,261 $1,794
64,185
kWh
$1,006
-
kW-mo/yr
$37,020
-
MMBtu
$450
-
lb
$60,424
-
Tgal