| Assessment Year | 1999 |
|---|---|
| Principal Product | Finishing services |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
125,000
ft2
|
| Annual Production | 263,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,067 | 595,838 |
kWh
|
$0.047 |
| Electricity Demand | $23,291 | 4,763 |
kW-mo/yr
|
$4.89 |
| Electricity Fees | $4,881 | - |
|
- |
| Natural Gas | $23,266 | 3,894 |
MMBtu
|
$5.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $116,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,936 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings | Primary Product Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $71 | $150 |
$48
879
kWh
|
$23
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $180 | $640 |
$101
2,052
kWh
|
$79
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $639 | $1,000 | - | - |
$639
-
MMBtu
|
- | - | - | - | - | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,080 | $5,000 |
$2,036
43,083
kWh
|
$704
-
kW-mo/yr
|
$(-1,260.0)
-
MMBtu
|
- | $1,600 | - | - | - | - | |
| 05 | 2.7124: Make a practice of turning off lights when not needed | $242 | $300 |
$125
2,638
kWh
|
$117
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| 06 | 2.2511: Insulate bare equipment | $639 | $768 | - | - |
$639
-
MMBtu
|
- | - | - | - | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $450 | $300 | - | - | - |
$450
-
lb
|
- | - | - | - | - | |
| 08 | 3.4153: Use counter current rinsing to reduce waste water | $373 | $420 | - | - | - | - | - | - |
$373
-
Tgal
|
- | - | |
| 09 | 4.445: Install equipment to move product | $89,503 | $60,000 | - | - | - | - | - | - |
$(-497.0)
-
Tgal
|
- | $90,000 | |
| 10 | 4.731: Advertise product or service | $21,800 | $200 | - | - | - | - | - | $(-11,500.0) | - | $33,300 | - | |
| TOTAL RECOMMENDED | $116,977 | $68,778 |
$2,310
48,652
kWh
|
$923
-
kW-mo/yr
|
$18
-
MMBtu
|
$450
-
lb
|
$1,600 | $(-11,500.0) |
$(-124.0)
-
Tgal
|
$33,300 | $90,000 | ||
| TOTAL IMPLEMENTED | $22,936 | $1,370 |
$173
3,517
kWh
|
$140
-
kW-mo/yr
|
- |
$450
-
lb
|
- | $(-11,500.0) |
$373
-
Tgal
|
$33,300 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings | Primary Product Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs