| Assessment Year | 1999 |
|---|---|
| Principal Product | Packaged medical supplies |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
100,000
ft2
|
| Annual Production | 2,200,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,347 | 4,802,755 |
kWh
|
$0.026 |
| Electricity Demand | $85,768 | 8,970 |
kW-mo/yr
|
$9.56 |
| Electricity Fees | $597 | - |
|
- |
| Natural Gas | $19,966 | 3,451 |
MMBtu
|
$5.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $94,161 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.424: Improve space comfort conditioning | $2,400 | $1,000 | n/a | - | - | - | - | $2,400 | - | - | - |
| 02 | 4.131: Modify process to reduce material use/cost | $52,800 | $1,000 | n/a | - | - | - | - | - | $52,800 | - | - |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,698 | $3,000 | n/a |
$3,698
142,145
kWh
|
- | - | - | - | - | - | - |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,887 | $8,000 | n/a |
$4,774
183,763
kWh
|
$8,647
-
kW-mo/yr
|
$(-4,534.0)
-
MMBtu
|
- | - | - | - | - |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,727 | $5,500 | n/a |
$4,160
160,023
kWh
|
$4,522
-
kW-mo/yr
|
$(-3,955.0)
-
MMBtu
|
- | - | - | - | - |
| 06 | 3.4111: Use closed cycle process to minimize waste water production | $2,424 | $500 | n/a |
$725
27,843
kWh
|
$1,311
-
kW-mo/yr
|
- | - | - | - | $100 |
$288
-
Tgal
|
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,920 | $500 | n/a | - | - | - |
$1,920
-
lb
|
- | - | - | - |
| 08 | 3.4154: Eliminate leaks in water lines and valves | $1,172 | $200 | n/a |
$826
41,911
kWh
|
- | - | - | - | - | - |
$346
-
Tgal
|
| 09 | 3.4114: Replace city water with recycled water via cooling tower | $16,133 | $1,000 | n/a | - | - | - | - | - | - | - |
$16,133
-
Tgal
|
| TOTAL RECOMMENDED | $94,161 | $20,700 |
$14,183
555,685
kWh
|
$14,480
-
kW-mo/yr
|
$(-8,489.0)
-
MMBtu
|
$1,920
-
lb
|
$2,400 | $52,800 | $100 |
$16,767
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs