ITAC Assessment: NC0168
ITAC logo
ITAC Assessment: NC0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Dyed synthetic yarns
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $50
M
to 100
M
# of Employees 433
Plant Area 230,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,384 23,501,759
kWh
Electricity Demand $564,541 59,930
kW-mo/yr
Electricity Fees $3,587 -
Natural Gas $688,338 196,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $11,533 $10,000 $11,533
-
MMBtu
- - - - -
02 2.2425: Use flue gases to heat process or service water $38,680 $200,000 $40,901
-
MMBtu
- - - - $(-2,221.0)
-
Tgal
03 3.4154: Eliminate leaks in water lines and valves $34,792 $5,000 $21,601
-
MMBtu
$12,191
-
Tgal
- - $1,000 -
04 3.6124: Burn waste oil for heat $787 $2,000 $259
-
MMBtu
- $528
-
gal
- - -
05 3.4155: Meter waste water $16,740 $3,500 - - - $16,740
-
lb
- -
TOTAL RECOMMENDED $102,532 $220,500 $74,294
-
MMBtu
$12,191
-
Tgal
$528
-
gal
$16,740
-
lb
$1,000 $(-2,221.0)
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs