ITAC Assessment: NC0166
ITAC logo
ITAC Assessment: NC0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Wood bed rails
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 135,000
ft2
Annual Production 375,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,530 1,009,086
kWh
Electricity Demand $19,981 4,086
kW-mo/yr
Electricity Fees $288 -
Natural Gas $10,809 2,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $756 $1,500 - - $756
-
MMBtu
- - -
02 2.7313: Recycle air for heating, ventilation and air conditioning $5,877 $15,000 - - $5,877
-
MMBtu
- - -
03 2.7134: Use photocell controls $601 $150 $351
7,327
kWh
$250
-
kW-mo/yr
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,328 $5,000 $3,600
76,495
kWh
$2,240
-
kW-mo/yr
$(-1,512.0)
-
MMBtu
- - -
05 2.2123: Insulate feedwater tank $328 $340 - - $328
-
MMBtu
- - -
06 2.4131: Size electric motors for peak operating efficiency $645 $800 $398
8,499
kWh
$247
-
kW-mo/yr
- - - -
07 3.6123: Burn wood by-products for heat $12,902 $62,200 - - $10,802
-
MMBtu
- $2,100
-
lb
-
08 3.3125: Use distillation, evaporation to remove contaminants $29,365 $82,000 $(-995.0)
(-21,102)
kWh
- - $30,360
-
gal
- -
09 4.445: Install equipment to move product $14,000 $15,500 - - - - - $14,000
10 4.621: Use fixtures to reduce machine changeout times $7,700 $1,000 - - - - - $7,700
TOTAL RECOMMENDED $76,502 $183,490 $3,354
71,219
kWh
$2,737
-
kW-mo/yr
$16,251
-
MMBtu
$30,360
-
gal
$2,100
-
lb
$21,700
TOTAL IMPLEMENTED $23,385 $18,490 $351
7,327
kWh
$250
-
kW-mo/yr
$1,084
-
MMBtu
- - $21,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs