Assessment Year | 1999 |
---|---|
Principal Product | Wood bed rails |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
135,000
ft2
|
Annual Production | 375,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,530 | 1,009,086 |
kWh
|
$0.047 |
Electricity Demand | $19,981 | 4,086 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $288 | - |
|
- |
Natural Gas | $10,809 | 2,328 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $756 | $1,500 | - | - |
$756
-
MMBtu
|
- | - | - | |
02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $5,877 | $15,000 | - | - |
$5,877
-
MMBtu
|
- | - | - | |
03 | 2.7134: Use photocell controls | $601 | $150 |
$351
7,327
kWh
|
$250
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,328 | $5,000 |
$3,600
76,495
kWh
|
$2,240
-
kW-mo/yr
|
$(-1,512.0)
-
MMBtu
|
- | - | - | |
05 | 2.2123: Insulate feedwater tank | $328 | $340 | - | - |
$328
-
MMBtu
|
- | - | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $645 | $800 |
$398
8,499
kWh
|
$247
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6123: Burn wood by-products for heat | $12,902 | $62,200 | - | - |
$10,802
-
MMBtu
|
- |
$2,100
-
lb
|
- | |
08 | 3.3125: Use distillation, evaporation to remove contaminants | $29,365 | $82,000 |
$(-995.0)
(-21,102)
kWh
|
- | - |
$30,360
-
gal
|
- | - | |
09 | 4.445: Install equipment to move product | $14,000 | $15,500 | - | - | - | - | - | $14,000 | |
10 | 4.621: Use fixtures to reduce machine changeout times | $7,700 | $1,000 | - | - | - | - | - | $7,700 | |
TOTAL RECOMMENDED | $76,502 | $183,490 |
$3,354
71,219
kWh
|
$2,737
-
kW-mo/yr
|
$16,251
-
MMBtu
|
$30,360
-
gal
|
$2,100
-
lb
|
$21,700 | ||
TOTAL IMPLEMENTED | $23,385 | $18,490 |
$351
7,327
kWh
|
$250
-
kW-mo/yr
|
$1,084
-
MMBtu
|
- | - | $21,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs