| Assessment Year | 1999 |
|---|---|
| Principal Product | Fuel filters and pumps |
| NAICS |
n/a
|
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
180,000
ft2
|
| Annual Production | 8,400,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $676,059 | 15,418,523 |
kWh
|
$0.044 |
| Electricity Demand | $386,137 | 30,817 |
kW-mo/yr
|
$12.53 |
| Natural Gas | $141,656 | 27,860 |
MMBtu
|
$5.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $131,659 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $87,159 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Raw Material Savings | Water Consumption Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $11,222 | $17,000 |
$11,222
255,862
kWh
|
- | - | - | - | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $1,614 | $1,600 |
$1,614
36,928
kWh
|
- | - | - | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,866 | $25 |
$5,175
118,113
kWh
|
$2,691
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.2514: Cover open tanks | $24,515 | $21,000 |
$16,937
386,284
kWh
|
$7,578
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $19,985 | $35,000 | - | - |
$19,985
-
MMBtu
|
- | - | - | - | |
| 06 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,068 | $1,000 | - | - | - |
$4,068
-
Tgal
|
- | - | - | |
| 07 | 3.4113: Treat and reuse rinse waters | $7,389 | $4,500 |
$(-262.0)
(-5,862)
kWh
|
$(-150.0)
-
kW-mo/yr
|
- | - | - |
$7,801
-
Tgal
|
- | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $55,000 | $14,000 |
$467
10,844
kWh
|
- |
$(-265.0)
-
MMBtu
|
- | $(-202.0) | - | $55,000 | |
| TOTAL RECOMMENDED | $131,659 | $94,125 |
$35,153
802,169
kWh
|
$10,119
-
kW-mo/yr
|
$19,720
-
MMBtu
|
$4,068
-
Tgal
|
$(-202.0) |
$7,801
-
Tgal
|
$55,000 | ||
| TOTAL IMPLEMENTED | $87,159 | $38,125 |
$18,216
415,885
kWh
|
$2,541
-
kW-mo/yr
|
$(-265.0)
-
MMBtu
|
$4,068
-
Tgal
|
$(-202.0) |
$7,801
-
Tgal
|
$55,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Raw Material Savings | Water Consumption Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs