ITAC Assessment: NC0155
ITAC logo
ITAC Assessment: NC0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Industrial fabric
NAICS
n/a
SIC 2228:
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 600,000
ft2
Annual Production 120,000
thousand feet
Production Hrs. Annual 8,700
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $652,161 24,804,221
kWh
Electricity Demand $340,261 35,115
kW-mo/yr
Natural Gas $470,599 107,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,913 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.3132: Recharge batteries on during off-peak demand periods $109 - - $109
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,802 $700 - - $2,802
-
MMBtu
-
03 2.2625: Chill water to the highest temperature possible $441 $50 $441
16,999
kWh
- - -
04 2.7124: Make a practice of turning off lights when not needed $386 - $270
10,258
kWh
$116
-
kW-mo/yr
- -
05 2.7229: Air condition only space necessary $3,045 $5,426 $2,079
65,064
kWh
$966
-
kW-mo/yr
- -
06 2.2532: Use only amount of air necessary to prevent explosion hazard $15,130 $9,000 $3,945
150,059
kWh
$2,826
-
kW-mo/yr
$8,359
-
MMBtu
-
07 4.521: Clear and rent existing space $50,000 $150,000 - - - $50,000
TOTAL RECOMMENDED $71,913 $165,176 $6,735
242,380
kWh
$4,017
-
kW-mo/yr
$11,161
-
MMBtu
$50,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs