| Assessment Year | 1998 |
|---|---|
| Principal Product | Industrial fabric |
| NAICS |
n/a
|
| SIC | 2228: |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
600,000
ft2
|
| Annual Production | 120,000
thousand feet
|
| Production Hrs. Annual | 8,700
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $652,161 | 24,804,221 |
kWh
|
$0.026 |
| Electricity Demand | $340,261 | 35,115 |
kW-mo/yr
|
$9.69 |
| Natural Gas | $470,599 | 107,498 |
MMBtu
|
$4.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $71,913 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3132: Recharge batteries on during off-peak demand periods | $109 | - | - |
$109
-
kW-mo/yr
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,802 | $700 | - | - |
$2,802
-
MMBtu
|
- | |
| 03 | 2.2625: Chill water to the highest temperature possible | $441 | $50 |
$441
16,999
kWh
|
- | - | - | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $386 | - |
$270
10,258
kWh
|
$116
-
kW-mo/yr
|
- | - | |
| 05 | 2.7229: Air condition only space necessary | $3,045 | $5,426 |
$2,079
65,064
kWh
|
$966
-
kW-mo/yr
|
- | - | |
| 06 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $15,130 | $9,000 |
$3,945
150,059
kWh
|
$2,826
-
kW-mo/yr
|
$8,359
-
MMBtu
|
- | |
| 07 | 4.521: Clear and rent existing space | $50,000 | $150,000 | - | - | - | $50,000 | |
| TOTAL RECOMMENDED | $71,913 | $165,176 |
$6,735
242,380
kWh
|
$4,017
-
kW-mo/yr
|
$11,161
-
MMBtu
|
$50,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs