ITAC Assessment: LM0053
ITAC logo
ITAC Assessment: LM0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product transformers
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 28,000
ft2
Annual Production 14,400
pieces
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,486 547,440
kWh
Electricity Demand $15,520 1,884
kW-mo/yr
Electricity Fees $5,322 -
Natural Gas $2,779 431
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7144: Install spectral reflectors / delamp $1,027 - $793
6,120
kWh
$234
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,855 $6,210 $2,205
17,010
kWh
$650
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $34 - $26
197
kWh
$8
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,585 $3,275 $1,238
9,553
kWh
$347
-
kW-mo/yr
- -
05 4.432: Cross-train personnel to avoid lost time $64,652 $4,768 - - $64,652 -
06 4.122: Develop standard procedures to improve internal yields $37,911 $24,550 - - - $37,911
TOTAL RECOMMENDED $108,064 $38,803 $4,262
32,880
kWh
$1,239
-
kW-mo/yr
$64,652 $37,911
TOTAL IMPLEMENTED - - - - - -