ITAC Assessment: NC0154
ITAC logo
ITAC Assessment: NC0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product rulers and tape measures
NAICS
n/a
SIC 3490:
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 500,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,458 19,164,713
kWh
Electricity Demand $389,763 45,845
kW-mo/yr
Electricity Fees $288,472 -
Natural Gas $137,144 32,744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $597,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings Primary Product Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,913 $15,000 n/a $3,360
120,164
kWh
$2,004
-
kW-mo/yr
$(-2,451.0)
-
MMBtu
- - - - -
02 2.2153: Close off unneeded steam lines $2,893 $3,000 n/a $777
27,843
kWh
- $2,116
-
MMBtu
- - - - -
03 2.7313: Recycle air for heating, ventilation and air conditioning $2,295 $825 n/a $457
16,413
kWh
$721
-
kW-mo/yr
$1,117
-
MMBtu
- - - - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $1,693 $5,000 n/a $1,693
60,375
kWh
- - - - - - -
05 2.6218: Turn off equipment when not in use $1,140 - n/a $627
22,274
kWh
$513
-
kW-mo/yr
- - - - - -
06 2.1221: Replace obsolete burners with more efficient ones $3,876 $1,500 n/a - - $3,876
-
MMBtu
- - - - -
07 3.3127: Use adsorption, ion exchange to remove contaminants $62,900 $5,500 n/a - - - $12,200
-
lb
- $(-12,000.0) $62,700
-
Tgal
-
08 4.131: Modify process to reduce material use/cost $520,000 - n/a - - - - $(-10,000.0) - - $530,000
TOTAL RECOMMENDED $597,710 $30,825 $6,914
247,069
kWh
$3,238
-
kW-mo/yr
$4,658
-
MMBtu
$12,200
-
lb
$(-10,000.0) $(-12,000.0) $62,700
-
Tgal
$530,000
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs