ITAC Assessment: NC0149
ITAC logo
ITAC Assessment: NC0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Decorative door glass
NAICS
n/a
SIC 3210:
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 68,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,302 4,272,567
kWh
Electricity Demand $59,673 23,546
kW-mo/yr
Electricity Fees $15,052 -
Natural Gas $11,899 1,599
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $79,194 $118,650 $69,920
1,398,886
kWh
$9,274
-
kW-mo/yr
- - - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,438 $100 - - $1,438 - - - -
03 4.214: Purchase appropriately sized material $6,400 $1,000 - - - - $3,400
-
gal
- $3,000
04 3.5313: Increase amount of waste recovered for resale $938 $200 - - - - - $938
-
lb
-
05 3.8143: Recycle cleaning solvent and reuse $1,472 $100 - - - - $912
-
gal
- $560
06 3.4111: Use closed cycle process to minimize waste water production $4,320 $800 - - - $4,320
-
Tgal
- - -
TOTAL RECOMMENDED $93,762 $120,850 $69,920
1,398,886
kWh
$9,274
-
kW-mo/yr
$1,438 $4,320
-
Tgal
$4,312
-
gal
$938
-
lb
$3,560
TOTAL IMPLEMENTED $14,568 $2,200 - - $1,438 $4,320
-
Tgal
$4,312
-
gal
$938
-
lb
$3,560
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs