ITAC Assessment: MA0234
ITAC logo
ITAC Assessment: MA0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RECYCLABLE PAPER
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area
n/a
Annual Production 13,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $775,711 10,079,133
kWh
Fuel Oil #6 $213,359 85,343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $95,700 $153,525 $95,700
1,243,259
kWh
- -
02 2.2443: Re-use or recycle hot or cold process exhaust air $38,424 $77,755 $(-12,566.0)
(-163,247)
kWh
$50,990
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $13,505 $24,600 - $13,505
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $9,100 $3,720 - $9,100
-
MMBtu
-
05 2.1213: Direct warmest air to combustion intake $2,845 $4,162 - $2,845
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $562 - $779
10,258
kWh
- $(-217.0)
TOTAL RECOMMENDED $160,136 $263,762 $83,913
1,090,270
kWh
$76,440
-
MMBtu
$(-217.0)
TOTAL IMPLEMENTED $118,305 $181,845 $95,700
1,243,259
kWh
$22,605
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs