ITAC Assessment: NC0147
ITAC logo
ITAC Assessment: NC0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Prison clothing, mattresses, furniture
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 225,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,575 2,241,208
kWh
Electricity Demand $40,103 8,201
kW-mo/yr
Electricity Fees $1,675 -
Natural Gas $56,633 9,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,432

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,282 $200 $1,282
27,257
kWh
- - - - -
02 2.2437: Recover waste heat from equipment $610 $500 - - $610
-
MMBtu
- - -
03 2.2515: Use optimum thickness insulation $723 $675 - - $723
-
MMBtu
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,356 $4,000 - - $7,356
-
MMBtu
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $375 $200 - - - $375
-
lb
- -
06 4.515: Install shelves / racks to utilize unused space $14,809 - $1,145
41,032
kWh
$683
-
kW-mo/yr
$1,011
-
MMBtu
- $11,970 -
07 4.451: Add additional production shift $100,000 $1,000 - - - - - $100,000
TOTAL RECOMMENDED $125,155 $6,575 $2,427
68,289
kWh
$683
-
kW-mo/yr
$9,700
-
MMBtu
$375
-
lb
$11,970 $100,000
TOTAL IMPLEMENTED $24,432 $4,900 $2,427
68,289
kWh
$683
-
kW-mo/yr
$8,977
-
MMBtu
$375
-
lb
$11,970 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings