Assessment Year | 1998 |
---|---|
Principal Product | Prison clothing, mattresses, furniture |
NAICS |
n/a
|
SIC | 2329: Men's and Boys' Clothing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
225,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,575 | 2,241,208 |
kWh
|
$0.047 |
Electricity Demand | $40,103 | 8,201 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $1,675 | - |
|
- |
Natural Gas | $56,633 | 9,228 |
MMBtu
|
$6.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $125,155 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,432 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,282 | $200 |
$1,282
27,257
kWh
|
- | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $610 | $500 | - | - |
$610
-
MMBtu
|
- | - | - | |
03 | 2.2515: Use optimum thickness insulation | $723 | $675 | - | - |
$723
-
MMBtu
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,356 | $4,000 | - | - |
$7,356
-
MMBtu
|
- | - | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $375 | $200 | - | - | - |
$375
-
lb
|
- | - | |
06 | 4.515: Install shelves / racks to utilize unused space | $14,809 | - |
$1,145
41,032
kWh
|
$683
-
kW-mo/yr
|
$1,011
-
MMBtu
|
- | $11,970 | - | |
07 | 4.451: Add additional production shift | $100,000 | $1,000 | - | - | - | - | - | $100,000 | |
TOTAL RECOMMENDED | $125,155 | $6,575 |
$2,427
68,289
kWh
|
$683
-
kW-mo/yr
|
$9,700
-
MMBtu
|
$375
-
lb
|
$11,970 | $100,000 | ||
TOTAL IMPLEMENTED | $24,432 | $4,900 |
$2,427
68,289
kWh
|
$683
-
kW-mo/yr
|
$8,977
-
MMBtu
|
$375
-
lb
|
$11,970 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs