Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Residential oil fired heaters
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 52,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,034 511,430
kWh
Electricity Demand $8,481 1,977
kW-mo/yr
Electricity Fees $733 -
LPG $11,088 1,246
MMBtu
Fuel Oil #2 $19,339 4,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
01 2.2514: Cover open tanks $488 $600 - - $488
-
MMBtu
- - -
02 2.2511: Insulate bare equipment $920 $800 - - $920
-
MMBtu
- - -
03 2.2531: Re-size charging openings or add movable cover or door $409 $1,480 $(-122.0)
(-2,638)
kWh
$(-67.0)
-
kW-mo/yr
$598
-
MMBtu
- - -
04 2.2437: Recover waste heat from equipment $178 $200 - - $178
-
MMBtu
- - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $13,890 $1,500 - - - - - $13,890
-
gal
06 3.1244: Reduce solution drag-out to prevent solution loss $2,431 - - - - $170
-
Tgal
$2,261
-
gal
-
TOTAL RECOMMENDED $18,316 $4,580 $(-122.0)
(-2,638)
kWh
$(-67.0)
-
kW-mo/yr
$2,184
-
MMBtu
$170
-
Tgal
$2,261
-
gal
$13,890
-
gal
TOTAL IMPLEMENTED $18,316 $4,580 $(-122.0)
(-2,638)
kWh
$(-67.0)
-
kW-mo/yr
$2,184
-
MMBtu
$170
-
Tgal
$2,261
-
gal
$13,890
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs