Assessment Year | 1998 |
---|---|
Principal Product | Residential oil fired heaters |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
52,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,034 | 511,430 |
kWh
|
$0.047 |
Electricity Demand | $8,481 | 1,977 |
kW-mo/yr
|
$4.29 |
Electricity Fees | $733 | - |
|
- |
LPG | $11,088 | 1,246 |
MMBtu
|
$8.90 |
Fuel Oil #2 | $19,339 | 4,205 |
MMBtu
|
$4.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,316 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,316 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $488 | $600 | - | - |
$488
-
MMBtu
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $920 | $800 | - | - |
$920
-
MMBtu
|
- | - | - | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $409 | $1,480 |
$(-122.0)
(-2,638)
kWh
|
$(-67.0)
-
kW-mo/yr
|
$598
-
MMBtu
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $178 | $200 | - | - |
$178
-
MMBtu
|
- | - | - | |
05 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $13,890 | $1,500 | - | - | - | - | - |
$13,890
-
gal
|
|
06 | 3.1244: Reduce solution drag-out to prevent solution loss | $2,431 | - | - | - | - |
$170
-
Tgal
|
$2,261
-
gal
|
- | |
TOTAL RECOMMENDED | $18,316 | $4,580 |
$(-122.0)
(-2,638)
kWh
|
$(-67.0)
-
kW-mo/yr
|
$2,184
-
MMBtu
|
$170
-
Tgal
|
$2,261
-
gal
|
$13,890
-
gal
|
||
TOTAL IMPLEMENTED | $18,316 | $4,580 |
$(-122.0)
(-2,638)
kWh
|
$(-67.0)
-
kW-mo/yr
|
$2,184
-
MMBtu
|
$170
-
Tgal
|
$2,261
-
gal
|
$13,890
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs