Assessment Year | 1998 |
---|---|
Principal Product | Commercial printer |
NAICS |
n/a
|
SIC | 2750: |
Sales Range | $50 M to 100M |
# of Employees | 134 |
Plant Area |
102,000
ft2
|
Annual Production | 35,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,372 | 5,050,410 |
kWh
|
$0.028 |
Electricity Demand | $118,871 | 14,163 |
kW-mo/yr
|
$8.39 |
Electricity Fees | $37,812 | - |
|
- |
Natural Gas | $62,605 | 9,941 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $187,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,611 | $25,000 |
$6,853
244,725
kWh
|
$(-1,242.0)
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.2622: Replace existing chiller with high efficiency model | $33,755 | $125,000 |
$8,324
297,479
kWh
|
$5,431
-
kW-mo/yr
|
- | - | - | $20,000 | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $434 | $25 |
$249
8,792
kWh
|
$185
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 3.5217: Reuse / recycle/ sell paper products | $3,308 | $200 | - | - | - |
$3,308
-
lb
|
- | - | - | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $22,875 | $100 | - | - | - | - | - | $(-7,625.0) | $30,500 | - | |
06 | 3.5217: Reuse / recycle/ sell paper products | $1,125 | $150 | - | - | - |
$1,125
-
lb
|
- | - | - | - | |
07 | 3.4114: Replace city water with recycled water via cooling tower | $9,088 | $1,200 | - | - |
$9,288
-
Tgal
|
- | - | - | - | $(-200.0) | |
08 | 4.131: Modify process to reduce material use/cost | $111,500 | $405,000 | - | - | - | - | $84,000 | - | - | $27,500 | |
TOTAL RECOMMENDED | $187,696 | $556,675 |
$15,426
550,996
kWh
|
$4,374
-
kW-mo/yr
|
$9,288
-
Tgal
|
$4,433
-
lb
|
$84,000 | $12,375 | $30,500 | $27,300 | ||
TOTAL IMPLEMENTED | $24,000 | $250 | - | - | - |
$1,125
-
lb
|
- | $(-7,625.0) | $30,500 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs