ITAC Assessment: NC0145
ITAC logo
ITAC Assessment: NC0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Commercial printer
NAICS
n/a
SIC 2750:
Sales Range $50
M
to 100
M
# of Employees 134
Plant Area 102,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,372 5,050,410
kWh
Electricity Demand $118,871 14,163
kW-mo/yr
Electricity Fees $37,812 -
Natural Gas $62,605 9,941
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $5,611 $25,000 $6,853
244,725
kWh
$(-1,242.0)
-
kW-mo/yr
- - - - - -
02 2.2622: Replace existing chiller with high efficiency model $33,755 $125,000 $8,324
297,479
kWh
$5,431
-
kW-mo/yr
- - - $20,000 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $434 $25 $249
8,792
kWh
$185
-
kW-mo/yr
- - - - - -
04 3.5217: Reuse / recycle/ sell paper products $3,308 $200 - - - $3,308
-
lb
- - - -
05 3.1191: Change procedures / equipment / operating conditions $22,875 $100 - - - - - $(-7,625.0) $30,500 -
06 3.5217: Reuse / recycle/ sell paper products $1,125 $150 - - - $1,125
-
lb
- - - -
07 3.4114: Replace city water with recycled water via cooling tower $9,088 $1,200 - - $9,288
-
Tgal
- - - - $(-200.0)
08 4.131: Modify process to reduce material use/cost $111,500 $405,000 - - - - $84,000 - - $27,500
TOTAL RECOMMENDED $187,696 $556,675 $15,426
550,996
kWh
$4,374
-
kW-mo/yr
$9,288
-
Tgal
$4,433
-
lb
$84,000 $12,375 $30,500 $27,300
TOTAL IMPLEMENTED $24,000 $250 - - - $1,125
-
lb
- $(-7,625.0) $30,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs