ITAC Assessment: AR0107
ITAC logo
ITAC Assessment: AR0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Commercial and Domestic Dryers
NAICS
n/a
SIC 3582: Commercial Laundry, Drycleaning, and Pressing Machines
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 252,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 5,005
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,534 7,536,929
kWh
Electricity Demand $216,375 19,954
kW-mo/yr
Natural Gas $195,170 57,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,236

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,776 $1,266 $1,525
43,669
kWh
$1,251
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $3,333 $2,110 $1,932
55,100
kWh
$1,401
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,376 $340 $3,659
105,803
kWh
$2,717
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $8,071 $11,370 $4,501
128,664
kWh
$3,570
-
kW-mo/yr
- - -
05 3.8142: Distill contaminated solvents for reuse $11,480 $11,000 - - $11,480
-
gal
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $240 - - - - $240
-
lb
-
07 3.5217: Reuse / recycle/ sell paper products $1,440 - - - - $1,440
-
lb
-
08 4.423: Move product using mechanical means $30,000 $25,000 - - - - $30,000
09 4.651: Install back-up equipment $17,000 $9,000 - - - - $17,000
TOTAL RECOMMENDED $80,716 $60,086 $11,617
333,236
kWh
$8,939
-
kW-mo/yr
$11,480
-
gal
$1,680
-
lb
$47,000
TOTAL IMPLEMENTED $39,236 $24,086 $11,617
333,236
kWh
$8,939
-
kW-mo/yr
- $1,680
-
lb
$17,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs