Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Textile goods
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 330
Plant Area 50,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,420 750,586
kWh
Electricity Demand $32,862 3,690
kW-mo/yr
Electricity Fees $2,048 -
Natural Gas $17,071 3,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Increase in Production Savings
01 2.2136: Install / repair insulation on steam lines $518 $658 - - $518
-
MMBtu
- - -
02 2.2123: Insulate feedwater tank $57 $90 - - $57
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,470 $325 $689
14,654
kWh
$781
-
kW-mo/yr
- - - -
04 2.4323: Use optimum size and capacity equipment $10,303 $3,000 $3,049
64,478
kWh
$3,454
-
kW-mo/yr
$3,800
-
MMBtu
- - -
05 3.5313: Increase amount of waste recovered for resale $10,440 $200 - - - - $10,440
-
lb
-
06 3.3125: Use distillation, evaporation to remove contaminants $1,035 $4,000 $(-77.0)
(-1,758)
kWh
$(-88.0)
-
kW-mo/yr
- $1,200
-
gal
- -
07 4.511: Expand operations into unused space $104,500 $168,500 - - - - - $104,500
TOTAL RECOMMENDED $128,323 $176,773 $3,661
77,374
kWh
$4,147
-
kW-mo/yr
$4,375
-
MMBtu
$1,200
-
gal
$10,440
-
lb
$104,500
TOTAL IMPLEMENTED $117,308 $175,825 $3,661
77,374
kWh
$4,147
-
kW-mo/yr
$3,800
-
MMBtu
$1,200
-
gal
- $104,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs