Assessment Year | 1997 |
---|---|
Principal Product | Dyed fabric for shirts |
NAICS |
n/a
|
SIC | 2619: |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
150,000
ft2
|
Annual Production | 7,500,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,786 | 8,654,162 |
kWh
|
$0.030 |
Electricity Demand | $133,083 | 15,879 |
kW-mo/yr
|
$8.38 |
Electricity Fees | $11,746 | - |
|
- |
Natural Gas | $914,606 | 218,206 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $221,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $513 | $448 |
$113
11,137
kWh
|
$400
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.7122: Disconnect ballasts | $474 | $750 |
$324
10,844
kWh
|
$150
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,610 | $2,650 | - | - |
$1,610
-
MMBtu
|
- | - | - | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,182 | $1,400 | - | - |
$3,182
-
MMBtu
|
- | - | - | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $759 | $700 | - | - |
$759
-
MMBtu
|
- | - | - | - | - | |
06 | 2.2135: Repair and eliminate steam leaks | $72,505 | $200 | - | - |
$73,505
-
MMBtu
|
- | - | $1,000 | - | $(-2,000.0) | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $9,082 | $5,200 | - | - | - | - |
$9,282
-
lb
|
- | $800 | $(-1,000.0) | |
08 | 3.4153: Use counter current rinsing to reduce waste water | $22,291 | $28,000 | - | - | - |
$22,291
-
Tgal
|
- | - | - | - | |
09 | 3.4115: Recover and reuse cooling water | $109,838 | $30,250 | - | - |
$61,169
-
MMBtu
|
$48,669
-
Tgal
|
- | - | - | - | |
10 | 2.1241: Reduce excessive boiler blowdown | $1,000 | - | - | - | - | - | - | - | - | $1,000 | |
TOTAL RECOMMENDED | $221,254 | $69,598 |
$437
21,981
kWh
|
$550
-
kW-mo/yr
|
$140,225
-
MMBtu
|
$70,960
-
Tgal
|
$9,282
-
lb
|
$1,000 | $800 | $(-2,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs