ITAC Assessment: NC0125
ITAC logo
ITAC Assessment: NC0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Engine components
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area 120,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,268 7,052,755
kWh
Electricity Demand $226,362 12,329
kW-mo/yr
Electricity Fees $20,723 -
Natural Gas $14,138 2,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $206,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,253

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
01 2.7232: Replace existing hvac unit with high efficiency model $34,969 $195,000 $14,759
432,884
kWh
$20,210
-
kW-mo/yr
- - - - - - -
02 2.4239: Eliminate or reduce compressed air usage $7,740 $1,600 $1,826
40,445
kWh
$5,914
-
kW-mo/yr
- - - - - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $25,586 - - $25,586
-
kW-mo/yr
- - - - - - -
04 2.7145: Install skylights $7,876 $40,250 $1,708
50,117
kWh
$6,168
-
kW-mo/yr
- - - - - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,480 $4,200 - - - $840
-
lb
- $(-500.0) - - $1,140
06 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $129,253 $33,480 - - $12,724
-
MMBtu
- $9,072 - $103,200 $4,257 -
TOTAL RECOMMENDED $206,904 $274,530 $18,293
523,446
kWh
$57,878
-
kW-mo/yr
$12,724
-
MMBtu
$840
-
lb
$9,072 $(-500.0) $103,200 $4,257 $1,140
TOTAL IMPLEMENTED $129,253 $33,480 - - $12,724
-
MMBtu
- $9,072 - $103,200 $4,257 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs