ITAC Assessment: NC0122
ITAC logo
ITAC Assessment: NC0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product mirrors
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 90,060
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,813 2,883,060
kWh
Electricity Demand $47,079 13,646
kW-mo/yr
Electricity Fees $8,140 -
Natural Gas $53,475 8,647
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.2515: Use optimum thickness insulation $1,591 $647 $1,082
24,619
kWh
$509
-
kW-mo/yr
- - - - - -
02 2.2136: Install / repair insulation on steam lines $884 $468 - - $884
-
MMBtu
- - - - -
03 2.7245: Use direct air supply to exhaust hoods $831 $1,000 $831
18,757
kWh
- - - - - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,262 $600 - - $2,262
-
MMBtu
- - - - -
05 2.4131: Size electric motors for peak operating efficiency $2,108 $3,500 $1,707
38,687
kWh
$401
-
kW-mo/yr
- - - - - -
06 2.1224: Replace boiler $8,881 $36,000 - - $8,281
-
MMBtu
- - $600 - -
07 2.7241: Install outside air damper / economizer on hvac unit $973 $1,500 $973
21,981
kWh
- - - - - - -
08 3.4113: Treat and reuse rinse waters $12,101 $2,500 - - $6,149
-
MMBtu
$5,952
-
Tgal
- - - -
09 3.5313: Increase amount of waste recovered for resale $27,463 $13,500 $(-227.0)
(-5,275)
kWh
- - - $27,690
-
lb
- - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $2,157 $400 - - - - $3,157
-
lb
$(-1,000.0) - -
11 4.111: Add equipment/ operators to reduce production bottleneck $36,445 $100,000 $(-388.0)
(-8,792)
kWh
$(-167.0)
-
kW-mo/yr
- - - $32,000 $5,000 -
12 4.511: Expand operations into unused space $9,330 $3,330 - - - - $(-370.0)
-
lb
$(-300.0) - $10,000
TOTAL RECOMMENDED $105,026 $163,445 $3,978
89,977
kWh
$743
-
kW-mo/yr
$17,576
-
MMBtu
$5,952
-
Tgal
$30,477
-
lb
$31,300 $5,000 $10,000
TOTAL IMPLEMENTED $12,460 $5,230 $973
21,981
kWh
- - - $2,787
-
lb
$(-1,300.0) - $10,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs