ITAC Assessment: NC0104
ITAC logo
ITAC Assessment: NC0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Socks
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 180,000
ft2
Annual Production 188,160,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,412 4,058,617
kWh
Electricity Demand $39,367 14,689
kW-mo/yr
Electricity Fees $24,304 -
Fuel Oil #6 $178,843 58,125
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,779

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,017 $2,816 $840
19,930
kWh
$177
-
kW-mo/yr
- - -
02 2.7134: Use photocell controls $1,117 $630 $1,117
26,671
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $840 $124
2,931
kWh
$11
-
kW-mo/yr
- - $60
04 2.2136: Install / repair insulation on steam lines $1,717 $2,017 $376
10,258
kWh
$73
-
kW-mo/yr
$1,268
-
MMBtu
- -
05 2.2443: Re-use or recycle hot or cold process exhaust air $9,962 $30,000 - - $9,962
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,451 $25,000 $8,451
201,934
kWh
- - - -
07 2.4239: Eliminate or reduce compressed air usage $2,733 $2,720 $2,733
65,064
kWh
- - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,714 $54,000 $28,829
686,694
kWh
$5,519
-
kW-mo/yr
$(-9,634.0)
-
MMBtu
- -
09 3.5313: Increase amount of waste recovered for resale $2,008 $200 - - - $2,008
-
lb
-
TOTAL RECOMMENDED $51,914 $118,223 $42,470
1,013,482
kWh
$5,780
-
kW-mo/yr
$1,596
-
MMBtu
$2,008
-
lb
$60
TOTAL IMPLEMENTED $6,779 $9,023 $5,190
124,854
kWh
$261
-
kW-mo/yr
$1,268
-
MMBtu
- $60
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs