ITAC Assessment: NC0098
ITAC logo
ITAC Assessment: NC0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fabric for Sheets
NAICS
n/a
SIC 2210:
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 275,000
ft2
Annual Production 3,750
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $867,935 29,069,168
kWh
Electricity Demand $528,249 60,410
kW-mo/yr
Electricity Fees $(-195,415.0) -
Natural Gas $74,038 24,856
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,675 $5,094 $7,579
236,811
kWh
$4,096
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $28,554 $71,700 $8,719
272,567
kWh
$4,762
-
kW-mo/yr
- $1,450
-
lb
$13,623 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $693 $3,080 $347
10,844
kWh
$126
-
kW-mo/yr
- - - $220
04 2.4133: Use most efficient type of electric motors $8,730 $7,176 $5,645
176,436
kWh
$3,085
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,689 $866 $7,559
236,225
kWh
$4,130
-
kW-mo/yr
- - - -
06 2.7313: Recycle air for heating, ventilation and air conditioning $12,027 $5,000 - - $12,027
-
MMBtu
- - -
07 2.2625: Chill water to the highest temperature possible $2,909 $50 $1,735
54,220
kWh
$1,174
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $76,277 $92,966 $31,584
987,103
kWh
$17,373
-
kW-mo/yr
$12,027
-
MMBtu
$1,450
-
lb
$13,623 $220
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs