ITAC Assessment: NC0095
ITAC logo
ITAC Assessment: NC0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Sensors
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 81,500
ft2
Annual Production 65,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,719 1,461,606
kWh
Electricity Demand $31,665 6,476
kW-mo/yr
Electricity Fees $3,626 -
Natural Gas $3,153 522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $1,105 $5,000 - $1,105
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $641 - - $641
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $549 $2,100 $349
7,327
kWh
$50
-
kW-mo/yr
- $150
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,473 $6,046 $3,081
65,358
kWh
$1,392
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $195 $90 $166
3,517
kWh
$29
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $439 $400 $347
7,327
kWh
$92
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $367 $367 $234
4,982
kWh
$133
-
kW-mo/yr
- -
08 2.4226: Use / purchase optimum sized compressor $1,022 $320 $704
14,947
kWh
$318
-
kW-mo/yr
- -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $38 $100 - - $38
-
lb
-
TOTAL RECOMMENDED $8,829 $14,423 $4,881
103,458
kWh
$3,760
-
kW-mo/yr
$38
-
lb
$150
TOTAL IMPLEMENTED $5,773 $11,136 $3,247
68,875
kWh
$2,526
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs