IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electric resistance heaters
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 386,500
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,907 4,923,212
kWh
Electricity Demand $154,753 14,329
kW-mo/yr
Natural Gas $143,205 28,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,763

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,208 $690 $509
15,240
kWh
$699
-
kW-mo/yr
- - - - -
02 2.4226: Use / purchase optimum sized compressor $761 - $761
23,154
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $1,464 $260 $511
15,533
kWh
$953
-
kW-mo/yr
- - - - -
04 2.2447: Heat water with exhaust heat $1,007 $2,000 - - $1,007
-
MMBtu
- - - -
05 3.2121: Convert to electrostatic powder coating $17,555 $140,000 $2,342
70,633
kWh
- - - $21,390
-
lb
$(-12,866.0) $6,689
06 3.5316: Contract a wood pallet recycling company $7,200 $100 - - - $7,200
-
lb
- - -
TOTAL RECOMMENDED $29,195 $143,050 $4,123
124,560
kWh
$1,652
-
kW-mo/yr
$1,007
-
MMBtu
$7,200
-
lb
$21,390
-
lb
$(-12,866.0) $6,689
TOTAL IMPLEMENTED $18,763 $140,690 $2,851
85,873
kWh
$699
-
kW-mo/yr
- - $21,390
-
lb
$(-12,866.0) $6,689
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs