ITAC Assessment: NC0087
ITAC logo
ITAC Assessment: NC0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pnuematic controls
NAICS
n/a
SIC 3490:
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 79,000
ft2
Annual Production 211,100
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,255 1,935,229
kWh
Electricity Demand $14,590 5,444
kW-mo/yr
Electricity Fees $21,021 -
Natural Gas $5,539 892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7314: Reduce ventilation air $1,513 $4,305 $221
5,275
kWh
$65
-
kW-mo/yr
$1,227
-
MMBtu
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $965 - - $965
-
kW-mo/yr
- - - - -
03 2.7232: Replace existing hvac unit with high efficiency model $862 $1,500 $567
13,482
kWh
$295
-
kW-mo/yr
- - - - -
04 2.7124: Make a practice of turning off lights when not needed $1,789 $2,100 $1,789
42,497
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $796 $1,839 $623
14,947
kWh
$173
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $487 $2,100 $310
7,327
kWh
$27
-
kW-mo/yr
- - - - $150
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $10,542 $1,800 - - - $1,400
-
gal
$172
-
lb
$8,970 -
08 3.3122: Use filtration, centrifuging to remove contaminants $94 $750 - - - $94
-
gal
- - -
09 3.1241: Slow insertion / withdrawal of parts from degreasing tank $3,360 $8,500 $(-470.0)
(-11,137)
kWh
$(-180.0)
-
kW-mo/yr
- $4,010
-
gal
- - -
TOTAL RECOMMENDED $20,408 $22,894 $3,040
72,391
kWh
$1,345
-
kW-mo/yr
$1,227
-
MMBtu
$5,504
-
gal
$172
-
lb
$8,970 $150
TOTAL IMPLEMENTED $16,647 $14,650 $1,886
44,842
kWh
$115
-
kW-mo/yr
- $5,504
-
gal
$172
-
lb
$8,970 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs