ITAC Assessment: NC0070
ITAC logo
ITAC Assessment: NC0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Contract Manufacturing
NAICS
n/a
SIC 3490:
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 42,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,860 1,664,420
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,358

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,358 $360 $1,358
19,930
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,703 $1,348 $1,703
30,188
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $634 $1,600 $634
4,689
kWh
-
04 2.7241: Install outside air damper / economizer on hvac unit $5,380 $9,000 $5,380
99,648
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $2,371 $3,525 $2,371
34,877
kWh
-
06 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $4,000 $10,000 - $4,000
-
lb
TOTAL RECOMMENDED $15,446 $25,833 $11,446
189,332
kWh
$4,000
-
lb
TOTAL IMPLEMENTED $1,358 $360 $1,358
19,930
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs