| Assessment Year | 1995 |
|---|---|
| Principal Product | Custom Molded Foam Products |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
170,000
ft2
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $299,137 | 5,858,148 |
kWh
|
$0.051 |
| Fuel Oil #2 | $13,436 | 3,170 |
MMBtu
|
$4.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,187 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,211 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4313: Provide proper maintenance of motor driven equipment | $7,069 | - |
$7,069
138,628
kWh
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $142 | $180 |
$142
2,931
kWh
|
|
| 03 | 2.2511: Insulate bare equipment | $415 | $250 |
$415
8,206
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $680 | $984 |
$680
16,706
kWh
|
|
| 05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $9,881 | $10,000 |
$9,881
192,556
kWh
|
|
| TOTAL RECOMMENDED | $18,187 | $11,414 |
$18,187
359,027
kWh
|
||
| TOTAL IMPLEMENTED | $7,211 | $180 |
$7,211
141,559
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs