ITAC Assessment: NC0057
ITAC logo
ITAC Assessment: NC0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Molded Foam Products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 170,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,137 5,858,148
kWh
Fuel Oil #2 $13,436 3,170
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4313: Provide proper maintenance of motor driven equipment $7,069 - $7,069
138,628
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $142 $180 $142
2,931
kWh
03 2.2511: Insulate bare equipment $415 $250 $415
8,206
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $984 $680
16,706
kWh
05 2.2614: Use cooling tower or economizer to replace chiller cooling $9,881 $10,000 $9,881
192,556
kWh
TOTAL RECOMMENDED $18,187 $11,414 $18,187
359,027
kWh
TOTAL IMPLEMENTED $7,211 $180 $7,211
141,559
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs