ITAC Assessment: NC0054
ITAC logo
ITAC Assessment: NC0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Acrylic Yarn
NAICS
n/a
SIC 2298: Cordage and Twine
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 105,600
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,257 1,594,373
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $3,963 $1,500 $3,963
82,649
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,092 $360 $2,092
30,481
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,362 $11,760 $3,362
70,047
kWh
04 2.7111: Reduce illumination to minimum necessary levels $3,675 $475 $3,675
76,495
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,438 $5,749 $2,438
68,875
kWh
TOTAL RECOMMENDED $15,530 $19,844 $15,530
328,547
kWh
TOTAL IMPLEMENTED $4,530 $6,109 $4,530
99,356
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs