Assessment Year | 1995 |
---|---|
Principal Product | Fiber Optic Cable |
NAICS |
n/a
|
SIC | 3669: Communications Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
100,000
ft2
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $534,154 | 9,454,279 |
kWh
|
$0.056 |
Natural Gas | $81,155 | 18,043 |
MMBtu
|
$4.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,811 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,208 | $4,662 |
$5,208
94,666
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $4,041 | $9,817 |
$4,041
73,857
kWh
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $8,910 | $15,000 |
$8,910
162,075
kWh
|
- | - | |
04 | 2.3112: Store heated/ cooled water for use during peak demand periods | $14,172 | $35,000 |
$14,172
-
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $291 | $1,320 |
$291
5,275
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,114 | $300 |
$1,114
20,223
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $680 | $440 |
$680
12,309
kWh
|
- | - | |
08 | 3.1175: Use a different or recycled raw material | $678 | - | - |
$678
-
lb
|
- | |
09 | 3.1162: Use less wasteful packaging | $3,717 | - | - | - | $3,717 | |
TOTAL RECOMMENDED | $38,811 | $66,539 |
$34,416
368,405
kWh
|
$678
-
lb
|
$3,717 | ||
TOTAL IMPLEMENTED | $14,371 | $16,099 |
$10,654
194,021
kWh
|
- | $3,717 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs