ITAC Assessment: NC0050
ITAC logo
ITAC Assessment: NC0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Fiber Optic Cable
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 100,000
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,154 9,454,279
kWh
Natural Gas $81,155 18,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,208 $4,662 $5,208
94,666
kWh
- -
02 2.2511: Insulate bare equipment $4,041 $9,817 $4,041
73,857
kWh
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $8,910 $15,000 $8,910
162,075
kWh
- -
04 2.3112: Store heated/ cooled water for use during peak demand periods $14,172 $35,000 $14,172
-
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $291 $1,320 $291
5,275
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,114 $300 $1,114
20,223
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $680 $440 $680
12,309
kWh
- -
08 3.1175: Use a different or recycled raw material $678 - - $678
-
lb
-
09 3.1162: Use less wasteful packaging $3,717 - - - $3,717
TOTAL RECOMMENDED $38,811 $66,539 $34,416
368,405
kWh
$678
-
lb
$3,717
TOTAL IMPLEMENTED $14,371 $16,099 $10,654
194,021
kWh
- $3,717
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs