ITAC Assessment: NC0044
ITAC logo
ITAC Assessment: NC0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Nitrogen Fertilizer Solutions
NAICS
n/a
SIC 2873: Nitrogenous Fertilizers
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 2,500,000
ft2
Annual Production 203,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,139,182 20,156,214
kWh
Natural Gas $616,294 140,753
MMBtu
Other Energy $402,211 168,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.2441: Preheat boiler makeup water with waste process heat $51,000 $30,000 - $51,000
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,164 $45,000 $32,164
643,611
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,742 $13,480 $19,742
252,345
kWh
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $3,593 $5,000 $3,593
71,805
kWh
-
05 2.7134: Use photocell controls $2,628 $840 $2,628
52,462
kWh
-
TOTAL RECOMMENDED $109,127 $94,320 $58,127
1,020,223
kWh
$51,000
-
MMBtu
TOTAL IMPLEMENTED $19,742 $13,480 $19,742
252,345
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs