Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bricks
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 273,000
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,079,419 19,891,266
kWh
Natural Gas $178,171 51,555
MMBtu
Wood $409,834 569,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $235,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2515: Use optimum thickness insulation $176,704 $52,500 n/a - $176,704
-
MMBtu
02 2.4133: Use most efficient type of electric motors $16,871 $27,600 n/a $16,871
312,427
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $26,900 $60,000 n/a $26,900
-
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,452 $23,090 n/a $12,452
230,657
kWh
-
05 2.5194: Redesign process $2,768 $782 n/a - $2,768
-
MMBtu
TOTAL RECOMMENDED $235,695 $163,972 $56,223
543,084
kWh
$179,472
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs