ITAC Assessment: NC0020
ITAC logo
ITAC Assessment: NC0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product APPLICATION OF PROTECTIVE POWDER COATINGS
NAICS
n/a
SIC 2652: Setup Paperboard Boxes
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 40,000
ft2
Annual Production 17,500,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,475 987,984
kWh
Natural Gas $118,703 26,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $410 $302 $410
7,327
kWh
-
02 2.4133: Use most efficient type of electric motors $1,282 $3,800 $1,282
20,809
kWh
-
03 2.2424: Use heat in flue gases to preheat products or materials $17,360 $2,355 - $17,360
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $55 $580
9,379
kWh
-
05 2.2511: Insulate bare equipment $4,029 $338 - $4,029
-
MMBtu
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,255 $4,012 $1,255
20,223
kWh
-
TOTAL RECOMMENDED $24,916 $10,862 $3,527
57,738
kWh
$21,389
-
MMBtu
TOTAL IMPLEMENTED $7,556 $8,507 $3,527
57,738
kWh
$4,029
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs